Power Plant

In 2015 Power plant was established, it produces stable quality electrical energy (constant frequency, stable voltage, required power factor) to MIC consumers. Leading to having its operation starting in 2018

Product Description

The Manaseer Industrial Complex (MIC) installed a captive power plant (CPP) to supply reliable electricity to its existing cement plant, Carbonate plant, MIC Smart and future loads.

 

The power plant project is designed to generate of 1x30 MW (net) capacity firing 100 percent coal or 100 percent petcoke or a combination of these fuels. The Project uses Circulating Fluidized Bed Combustor (CFBC) Technology based on Foster Wheeler (FWC) design for efficient firing of fuels to generate superheated steam that is fed to the SIEMENS steam turbine which is the prime mover for the electrical generator.

 

CFBC has good environmental characteristics and combustion efficiency; Sulfur dioxide (SO2) emissions are reduced through addition of limestone to the combustion chamber; the CFBC is also equipped with Selective Non-catalytic Reduction (SNCR) type NOx reduction system, both SOx & NOx emissions are below the allowable limits set by the government.

 

Coal / Petcoke are stored in a designated covered storage area (shed), and an automated fuel handling system (stacker, re-claimer, belt conveyors and crushers) insures reliable fuel feeding to the CFBC boiler.

 

Coal / Petcoke are stored in a designated covered storage area (shed), and an automated fuel handling system (stacker, re-claimer, belt conveyors and crushers) insures reliable fuel feeding to the CFBC boiler.

 

Power plant is designed for safe and reliable continuous operation and to meet 96% availability.

The balance of plant main systems are:

1- Water Treatment Plant using raw water from the onsite wells.

2- DC system with batteries and UPS,

3- Auxiliary power feeding system (Transformers, switchgears, and motor control centers)

4- Compressed air systems for instrument and service usage.

5- Black start diesel generators

6- Closed cycle cooling water system

7- Coal/ petcoke fuel storage, conveying, crushing, and feeding system

8- Ash handing system

9- Service /potable water system

10- Firefighting, alarm and annunciat system designed and constructed as per NFPA standard.

 

List of services: Major components:

  • Fuel (coal/petcoke) storage, handling, crushing and feeding.
  • Boiler (Circulating Fluidized Bed Combustion technology) with auxiliaries
  • Steam Turbine -Generator with auxiliaries
  • Air cooled condenser
  • Ash handling system
  • Water treatment plant
  • Compressed air system
  • SOx and NOx abatement systems to meet EU emission standards
  • Fire alarm, annunciation and fighting system

Manaseer Group, 8th circle

King Abdullah II St 302

Phone +962 (6) 565-0902

Fax +962 (6) 585-8549

P.O Box 925988 Amman 11110, Jordan

Feedback@manaseergroup.com

image banner

Newsletter

  • Follow Us

  • Footer Social
  • Footer Social
  • Footer Social
  • Footer Social
Download Center

© 2020 Manaseer Group. All Rights Reserved.